objectives for today

9.30 -Studio day plan objectives

•1 Finish the proposal

•2 Finish the muse design based on keywords and theme

•3 Finish 3 collages based on information I have so far

•4 Design several pieces based on collages

•5 Finish at least 2 outfits

4.20pm – progress on each task? 

•1 Proposal is completed

•2 Did not start the muse design, but drew several figures

•3 Collages are completed

•4 Completed a page of development of the design based on stand-up collage

•5 Not completed

Seven day plan objectives – what will you show Giles next week? 

•1 Muse head

•2 at least two completed design of outfit

•3 Colour story

•4 Fabric selection

In today’s session I started with designing my muse as I felt that this could be considered a prerequisite for design, having to set the tone and atmosphere. This includes the fact that when I have a muse, it will be easier for me to work on a human body for the design of the garment. In my search for inspiration, I discovered that in animal performance there exists the practice of tying up animals and adapting them to the position they want, as if they were puppeteers. I added this element of animals being tied up during abuse to my model poses and created several movements from this. For the afternoon session, I chose to make a collage by reducing the picture of the finished product I had made in the previous session by making a three-dimensional cutout, and based on this I worked on the design of the costume.